4 IN 1 CONVERTIBLE METAL CRIB
DL8410B4 / DL8410B4-GD
FULL SIZE BED ASSEMBLY INSTRUCTION
(HEADBOARD ONLY)
FULL SIZE CONVERSION RAILS AND LEGS ARE NOT INCLUDED. DIAGRAMS ARE
FOR REFERENCE ONLY. BED RAILS MAY DIFFER FROM ILLUSTRATION.
STEP 1: Attach the full size conversion
rails (not included) to the left and right
back posts (A & B) of the headboard.
STEP 2: Fasten the bolts with washers
and nuts (not included)
DIAGRAM 2
IMPORTANT: STORE ALL EXTRA PARTS THAT YOU ARE NOT USING FOR POSSIBLE FUTURE
USE AS YOU MAY WISH TO CONVERT AGAIN. ALWAYS STORE THE ASSEMBLY INSTRUCTIONS
IN THE POUCH ATTACHED TO THE MATTRESS SUPPORT (E).