VGE xclear UV-C PRO 75 000 AMALGAM Mode D'emploi page 4

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
This product can only be used according to the guidelines described in these instructions
EN
for use.
INSTALLATION OF THE EARTH (DRAWING 1)
1. Pull the cable (B) through the strain relief (F) before fitting the synthetic strain relief (F) onto
the earth bolt (A). Position the strain relief (F) at approximately 10 cm from the eye (H) of
the earth cable (B).
2. Place the eye (H) of the cable (B) onto the earth bolt (A) that is fitted to the housing.
3. Then place a toothed lock washer (C), a hexagon nut (D) and another toothed lock washer
(E) on top of the eye (H).
4. Fit the strain relief (F) on top, creating a loop of Ø 5 cm.
5. Finally place the lock nut (G) onto the earth bolt (A).
6. Once the various nuts have been placed onto the earth bolt (A) in the correct sequence,
they can be tightened with a spanner or a ring spanner number 8. Do not tighten too
firmly, otherwise you may crack the strain relief. (The transparent nut that was screwed on
the earth bolt (A) on delivery has no further use, and can be discarded).
INSTALLATION OF THE DEVICE (DRAWING 2)
This device must never be put in the water. Always install outside the pond.
Switch the device off when administering medication.
Never install the unit in an area exposed to full sunlight. The installation must always take place
in a dry and well-ventilated area.
1. Determine where the device will be installed. Make sure to leave a free area (+/- 1 metre) in
order to be able to remove the lamp (K) / quartz glass (M) for the purpose of replacement
and/or maintenance.
2. Install the UV-C unit in a fixed position; if necessary secure the unit onto a solid rear wall
using pipe clips (not supplied).
3. Mount the unit into the circuit. The glued socket (I) for the flow switch (X) must be glued
with the screw thread (W) pointing upwards (see Drawing 2). The arrow on top of the flow
switch (X) must always point in the direction in which the water is flowing. The Blue Lagoon
UV-C Pro will not switch on if the flow switch is pointing in the opposite direction (against
the flow of the water).
4. Unscrew the screw ring (N) of the lamp on top of the housing (U). Carefully place the
quartz glass (M) in the housing (U). Place the o-ring (T) in the correct position with regard
to the quartz glass.
5. Remove the UV-C lamp (K) from the supplied case (see packaging) and carefully slide the
lamp into the quartz glass (M). Carefully connect the white lamp holder (L) to the UV-C
lamp (K) and then screw the screw ring (N) hand-tight onto the housing (U). In doing this,
pay attention to the correct position of the O-ring (T) with regard to the quartz glass.
6. Activate the pump and check the flow and any leakage of the system.
|
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Xclear uv-c pro 150 000 amalgam

Table des Matières