5.2. Packaging
Please do not simply throw away the packaging material. Paper, card and corrugated board as well as
plastic packaging materials should be placed in the correct collection containers.
5.3. Wood protection
The wood must not be exposed to bright sun or moisture before and during assembly.
Pressure-treated products are already protected against moisture, wood-eating insects and fungus. Greying
of the surface is not prevented. Blue stain protection is not provided.
Both untreated and pressure-treated wood may require finishing treatment for visual appearance or in the
event that completely natural dry cracks occur.
Pressure-treated garden wood which has a very high moisture content after production due to the process
tends to get stains and surface mould during storage. These neither destroy the wood nor affect its
strength. The mould can be removed with a brush, for example, after the wood has dried and weathering will
remove this visual flaw.
5.4. Installation information:
Please follow section 4.4. 'Safety information'.
5.4.1. This must be considered before installation!
When marking out your pool at the planned site, pay particular attention to the location of the existing
electricity and water connections/cables and determine the location of the skimmer or plant room
accordingly.
This is also to be considered when arranging the first layer of boards. The location of the swimming pool
must be firm and completely level, any slopes must therefore be smoothed out.
Preparation of the substrate (see 4.4 above):
We recommend the following work steps:
- Remove any turf present.
- Ground excavation
- Level and compress land
- Add an approx. 5 cm layer of ballast and level it
- Add an approx. 2 cm layer of fine sand, level an compress it
Check that the ground is level, correct if necessary.
Lay and align first layer of boards
Continue as described in section 6 of the instructions
If the measured height differences deviate from each other by more than 1.0 cm, the substrate was
incorrectly prepared.
Minor limited uneven areas can be levelled with a fine layer of sand.
The
require foundations for reinforcement supports (see section 6 'Installation instructions'). Its creation is
integrated into the general course of events.
Once the ground has been successfully adjusted/levelled, the height and horizontal position of the
foundations are to be marked out.
Technische Änderungen vorbehalten! Alle Maßangaben sind ca. Maße.
- swimming pool incl. plant room
592.4070 / 594.4070
- swimming pool incl. plant room
592.4085 / 594.4085
20
Copyright HRB 3662