Read instructions carefully before attempting to install fixture. Save these instructions.
WARNING: Disconnect power during installation and before serving.
SAFETY:
This fixture must be wired in accordance with the Canadian Electrical Code, and
applicable local codes and ordinances.
Proper grounding is required to insure personal safety.
A qualified electrician should perform all wiring.
This fixture is for outdoor use and should not be used in areas with limited ventilation or
high ambient temperatures.
Junction Box Mounting:
1. Installing the fixture to wall surface according to Fig 1 & 2,
2. Open the fixture by removing the four (4) screws located on the corners of the front housing.
3. Mount the fixture back plate to the J-Box (not provided), using the appropriate knock-out holes.
4. Make wiring connections and make sure that all wires are safely contained inside.
5. Reinstall the front fixture housing, tighten the four corner screws.
6. After installing the fixture, to weatherproof installation apply silicone caulking around
the top and both sides of the mounting plate and surface.
Wiring Connections:
CAUTION: Check that supply voltage is compatible with fixture ballast. Use approved connectors for
all electrical connections.
• Connect the black fixture wire to the black supply wire (line).
• Connect the white fixture wire to the white supply wire (neutral).
• Connect the green fixture wire to the junction box ground wire.
Aiming:
Set vertical aiming by loosening (slightly) the screw on swivel arm. Aim fixture to desired illumination
angle and securely re-tighten screw.
These instructions do not purport to cover all details or variations in equipment nor to provide for every possible contingency to be met in connection with installation,
operation or maintenance.
RAB DESIGN LIGHTING INC.
222 Islington Avenue. Toronto, Ontario, M8V 3W7
INSTALLATION INSTRUCTIONS
VEK1 and VEK2 LED Series
Fig. 1
Fig. 2
IS-VEK
Rev. 0