Important - Danze Ziga Zaga DC031221 Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles


2. Install new wax ring (not included) on the bot-
tom of the toilet (A) making sure not to cover the
toilet outlet. (Alternate Method: The wax ring
may also be placed onto the floor flange.)
3. Install the new floor mounting bolts (not in-
cluded) upright in the slots of the floor flange.
Place the toilet (A) over the floor flange/ waste
line opening by aligning the floor mounting
bolts in the toilet floor bolt holes. Press down
firmly and twist toilet (A) slightly to compress
wax ring and assure a seal between the toilet
(A) and floor.
4. Place one floor mounting bolt washer (not
included) over each floor mounting bolt and as-
semble the floor mounting bolt nut to the floor
mounting bolt. Tighten floor mounting bolt nut
carefully until the floor mounting bolt nut is just
snug.
5. Install the ceramic floor bolt cover plates (O)
by firmly pressing the ceramic floor bolt cover
plates (O) into the recesses in the side wall of
the toilet (A). (Six additional strips of hook and
loop tape (P) are provided should replacements
be needed in the future.)
6. The fill valve coupling nut (H) is provided to
connect the water supply line to the fill valve.
Do not use pipe dope! Hand tighten only!
Overtightening may split the fill valve and will
void the warranty.
7. If using flexible water supply line (not includ-
ed), assemble the flexible water supply line to
the threads of the tank fill valve. Do not use Tef-
lon tape or pipe dope on the fill valve threads.
This could result in over-tightening and break-
age.
8. Make sure refill tube adaptor (I) is attached to
the top of the flush valve overflow tube. Note:
Flow from the refill tube must be positioned di-
rectly over the overflow tube.
9. IMPORTANT: Always clear sand and rust
from system.
Remove valve top by lifting arm and rotat-
ing top 1/8 turn counterclockwise.
While holding a container over the un-
capped valve to prevent splashing, turn
water supply on and off a few times. Leave
water supply off.
Replace top by engaging lugs and rotating
1/8 turn clockwise. Make certain top is
turned to the locked position. Valve may
not turn on if the top is not fully turned
to the locked position.


Publicité

Table des Matières
loading

Table des Matières