Table of Contents Table des Matières VEX IQ Assembly Tips...................2 Conseils d’ A ssemblage VEX IQ..............2 Standard Drive Base..................4 Base Mobile Standard..................4 Build Steps 1-19 Étapes de Construction Clawbot IQ.......................10 Clawbot IQ.......................10 Build Steps 20-87 Étapes de Construction Clawbot IQ with Sensors................28 Clawbot IQ avec Capteurs................28 Build Steps 88-101...
VEX IQ Assembly Tips: Conseils d ’ A ssemblage VEX IQ: Connector Pins can be smoothly removed from Smart Motors, Sensors, or Robot Brains using a 1x Beam. Put the 1x Beam onto the pin and twist the Beam while pulling outward. Use a 1x Beam for extra leverage when mounting small VEX IQ Les connecteurs peuvent être facilement retirés des moteurs elements on shafts.
Standard Drive Base Base de Conduite Standard Required parts Pièces requises 228-2500-120 228-2500-143 228-2500-214 228-2500-060 228-2500-026 228-2560 Look for Quey for build tips Recherche Quey pour les conseils de construction Use a 1x beam as guide Completed build step for position on shaft Étape de construction fini Utiliser une poutre comme guide de...
Clawbot IQ with Sensors Clawbot IQ avec Capteurs 228-2500-060 228-2500-134 228-3010 vexiq.com/clawbotiq/89 vexiq.com/clawbotiq/88 228-2500-060 228-2780-001 200mm 228-3011 vexiq.com/clawbotiq/90 vexiq.com/clawbotiq/91...
Page 36
Distributed in the U.S.A. by VEX Robotics, Inc., 1519 Interstate 30 West, Greenville, Texas 75402, U.S.A. Distributed in Europe by Innovation First Trading, Inc., 6 Melford Court, Hardwick Grange, Warrington UK WA1 4RZ (44) (0) 1925 453144. Distributed in Canada by/Distribué...