OZ Lifting Products SPARK RESISTANT Serie Manuel De L'opérateur page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Push Beam Trolley Installation
Measure the width of the beam that the trolley will be mounted on. Ensure that the beam is within the
adjustable flange width range of the trolley.
Using the provided washers/spacers, assemble an equal number of washers/spacers on each side of the
bail to position the sideplates so that there is an 1/8" gap between the flange of each wheel and the beam.
The bail must be centered. The extra washers should be placed equally on the outside of the sideplates.
NOTE: There must always be at least one washer on both sides of each sideplate.
Once the correct number of washers/spacers are in place, loosen the nuts slightly. This will allow the
sideplates to be installed over the beam more easily.
With the sideplates installed onto the beam, firmly tighten the nuts on both sides of the trolley. Secure these
nuts with the second locknuts. Ensure that both sets of nuts are tight.
Operation
Warnings & Precautions
Trolley operators should read and fully comprehend this entire manual and all warnings on the trolleys
before beginning operation. If this manual is not read and followed completely, injuries may occur.
Operator Requirements:
• Be trained in proper trolley operation and in dealing with potential malfunctions.
• Abstain from use of alcohol, medications, or drugs while operating.
• Avoid operation while tired or distracted.
• Avoid operation if they have a history of seizures or other medical issues that may interfere with operation.
• Have proper coordination and vision.
NOTE: Prior to operation, ensure trolley is in proper working condition and maintenance records are up to
date.
Operation
Be aware of trolley load capacity and don't overload.
Attach load to suspension plate directly under the trolley.
Maintenance
Inspection
Operators should visually inspect the trolleys on a regular basis. Observe for wear, damage, cuts, cracks,
or corrosion. If any problems are observed, the trolleys should be placed out of service until they can be
repaired. Use only OZ Lifting Products LLC® for replacement parts.
Complete a monthly inspection of the suspension plate, track wheel, and locking nuts. Ensure that locking
nuts are secure.
Trolleys should be taken to an authorized repair center for professional inspection once a year.
EN pg.6

Publicité

Table des Matières
loading

Table des Matières