Installation Instructions
1. Install the ProPlate™ to a stud or to a bracket securely. Integral top/
bottom track works with common flat brackets. To fix plate position,
install a screw between plate and bracket.
NOTE:
Be sure "699 Series" mark on product is facing unfinished
wall side.
2. Align tabs on valve base with socket and push valve into place.
Connect valve to water supply, and make all other connections
per ASTM standard.
NOTE:
orientation.
3. As desired, place the appropriate color clip to indicate hot (red) or
cold (blue) water supply.
4. Be sure valve is in OFF position and test.
Replace any defective product.
5. Install debris cover onto plate.
6. Flush the water line, downstream of the valve, before operation.
7. At finish, remove debris cover and nylon valve cap. Check for leaks
and replace any defective product. Install frame.
VALVE REPLACEMENT / EXTENSION INSTALLATION
1. Holding the valve in place, loosen the swivel nut and remove valve.
Remove silicone seal, from bottom
of valve body or nut, and keep.
2. Clean seal of debris, inspect for
cracks/splits - replace any defective
seals. Place seal onto SHANK
(inside of nut) with grip ring
marks facing INWARD, not
towards valve.
3. Holding the valve in position, tighten
the swivel nut completely.
4. Be sure valve is in OFF position and
perform pressure test.
Replace any defective product
VALVE OUTLET REORIENTATION
1. Holding the valve in place, loosen the swivel nut ½ turn.
2. Re-orient the valve outlet to the desired direction.
Hold valve firmly in place.
3. Holding the valve in place, tighten the swivel nut completely.
4. Be sure valve is in OFF position and perform pressure test.
Replace any defective product.
See instructions below to change valve
(AFTER DRYWALL)