Honeywell NOTIFIER NRXI-GATE Manuel D'installation page 2

Interface systeme radio
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Figure 4: Rotary Address Switches
X 10
Loop Status LED (Note: Panel command generally has priority)
Isolator State
Panel Command
Normal
Open
Normal
Open
Normal
Open
RF status LED
Gateway Status
Power-on initialisation
(no fault)
Fault
Un-commissioned
Pre-commissioned
Commissioning
Sync
Normal
Network Fault
Recovery mode
Pittway Tecnologica S.r.l.
Via Caboto 19/3, 34147 Trieste, Italy
EN54-25: 2008 / AC: 2010 / AC: 2012
Components Using Radio Links
EN54-17: 2005 / AC: 2007 Short-Circuit Isolators
EN54-18: 2005 / AC: 2007 Input/Output Devices
for use in fire detection and fire alarm systems for buildings
N200-303-00
X 1
LED off
Off (Amber blink if device fault)
LED off
Amber on
LED on
Red on
LED on
Red on
LED blink
Green blink (Amber if device fault)
LED blink
Amber on
LED State
Long Green pulse
3 Green blinks
Blink Amber every 1s.
Red/Blue double-blink every 14s
(or just Blue when communicating).
Blue/Red double-blink every 14s (or just
Blue when communicating).
Blue/Green double-blink every 14s (or
just blue when communicating).
Blue/Amber double-blink every 14s
(or just Blue when communicating).
Blue blink every 14s.
Amber/Blue double-blink every 14s
Blue/Blue double-blink every 14s
0333 16
DOP-IRF014
Notifier by Honeywell, Brooks Road, Lewes, East Sussex, BN7 2BY, UK
PROGRAMMING
A commissioning operation is necessary to associate the RF
gateway with its related RF devices. Commissioning the gateway
is performed using the NRX-USB RF interface connected to a
PC running the Device Interface Software (DIS) tool. The data
file created when the system was designed is downloaded into
the gateway and the gateway uses this information to configure
the RF system. The gateway searches for all its associated RF
devices and programmes them with their network parameters;
it then orchestrates the creation of a fully functional RF mesh
network. (For further information, see the Radio Programming
and Commissioning Manual - ref. N200-306-00.)
NOTE: Do not run more than one interface at a time to
commission devices in an area.
NOTE: Batteries should not be fitted into RF devices until the
system commissioning time.
LED State
Meaning
Gateway is un-commissioned
(factory default)
Gateway is (pre-)commissioned
Gateway has an internal trouble
Gateway is powered and is waiting to be
programmed.
Data has been downloaded into gateway,
waiting to begin RF network commissioning.
Gateway has started commissioning, but
complete RF network not yet created.
Trying to re synchronize the RF network
from Idle status.
RF communications are established;
gateway and network working properly.
Gateway is experiencing an RF network
problem.
RF network has one or more missing links
and gateway is trying to reconfigure them.
LED INDICATORS AND FAULT DESCRIPTION
The Radio Gateway has two LED indicators:
LED1:
Loop communications status
LED2
RF communications status
EU Declaration of Conformity
Hereby,
Notifier by Honeywell declares
equipment type
NRXI-GATE
is in compliance
directive 2014/53/EU
The full text of the EU DoC can be requested from:
HSFREDDoC@honeywell.com
Patents Pending
that the radio
with
I56-4207-002

Publicité

Table des Matières
loading

Table des Matières