Getting Started
This is a brief document designed to quickly get you started setting up your valve manifold with an integrated
Numatics' G2-2 series ControlNet communication node.
1) Initial Unpacking and Inspection
1) Examine exterior of package for signs of damage. Report any damage to shipping carrier.
2) Remove wrapped manifold assembly from box.
a) Remove manifold assembly from anti-static packaging
b) Retain documentation for installation and configuration
3) Examine manifold assembly for any shipping damage such as:
a) Bent pins or connectors
b) Report any damage to shipping carrier immediately
4) Examine manifold assembly for proper ordered configuration. (Valves, I/O, Protocol, etc.)
2) G2-2 Introduction
Below is an example of a 2012 series valve manifold. This fieldbus manifold series is capable of addressing a
total of 224 I/O. The manifold can be viewed as having two sections to it, the
Side
Valve Side
. The
maximum of 6 modules totaling 192 Outputs, 96 Inputs, or various combinations. The communication
module has two BNC communication connectors. The power module has a 4-pin power connector. Pin-outs
for these, along with I/O connectors, are labeled on the side of the respective modules.
G2-2 Series ControlNet Quick Start Manual
supports a maximum of 32 solenoid coils and the
3835052 TDG22CNQS4-0
Subject to change without notice
www.numatics.com/fieldbus
Valve Side
Discrete I/O Side
(Maximum of 32 Solenoids)
Module/
Chassis Ground
Network
Aux. Power
Status LED's
LED's
Power
Module
Communications
Module
1/07
Discrete I/O
and the
supports a
Valve Side
Connection
Valve
End Plates
Valve
Valve Side
Sub-D Output
Module
Manual
Override
Solenoid LED
Status Indicator
Page 1