Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

• Install wall cups.
Step 3
• Place the gate in the opening so that the bottom of the gate
frame is completely at on the oor. Figure 3A.
• Secure the gate, fasten the mounting cups to the wall by
aligning them with the bolts with rubber pads. Use double
coated tape or screws provided as shown in gure 3B.
IMPORTANT: Never install this gate without mounting cups!
3A
Gate
• Mount your gate
Step 4
• Place the gate where you want to install it, then extend all 4 bolts
with rubber pads until they reach the walls. Ensure that the ends of
the bolts with rubber pads are seated inside the mounting cups.
3B
Floor
Page 4

Publicité

Table des Matières
loading

Table des Matières