All manuals and user guides at all-guides.com
Run the Schedule
After the schedule times have been set (per above instructions), you
Run Schedule
will use the
to take effect.
There are two methods for running the schedule, either from a
slideshow or from the
CAUTION: After you select the
Run Schedule from Slideshow
1. Start a slideshow and press
button when it appears in the lower left corner of the screen
(approx 10 sec).
2. To run the schedule when the
displayed, restart your slideshow and then press
Run Schedule
the
3. The DPF will go into stand-by mode according to the schedule,
and when it resumes operation, the slideshow will again begin
to play.
Run Schedule from CALENDAR/CLOCK Screen
CALENDAR/CLOCK
1. On the
Run Schedule
2. Select
3. The DPF will go into stand-by mode according to the schedule,
and when it resumes operation, the
again be displayed.
A small timer clock will appear indicating the schedule is active,
and then the DPF will operate according to the set schedule.
function whenever you want the schedule
CALENDAR/CLOCK
intervention will cancel the activation (i.e., pressing
remote or control button, powering off) and the schedule
will not take effect until you select this function again to
re-activate.
ENTER
button when it appears.
screen, press
.
screen.
Run Schedule
function, any user
Run Schedule
to select the
Run Schedule
button is no longer
ENTER
MENU
Calendar/Clock
to select
.
screen will
31