Installation - rialto ZR-RELAY-RI Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

1. Shut off the electrical power supply where the product is to be installed
2. Fix the S
3. Depending on the type of application, make the connections as shown
in the diagrams (fig. 1 or 2) and as indicated by the manufacturer of the
device to be controlled
4. Restore electrical power
5. Check that the indicator Led is alight (red and blinking) (see table 1)
6. Start the "R
that will add the S
EN
7. Follow the guided procedure provided by the App for pairing the new
device with the Rialto system.
L
N
Fig. 1: connection to digital input of an electronic appliance with separate power source
R
to the wall or other mounting surface
maRt
elay
" a
 select "Add device" to initiate the procedure
ialto
pp
R
maRt
elay
to the Rialto network
L N
C NO
| 18 |
Digital
input

Publicité

Table des Matières
loading

Produits Connexes pour rialto ZR-RELAY-RI

Table des Matières