Télécharger Imprimer la page

Lenze E94AZPP04 Serie Instructions De Montage page 58

Publicité

5
Electrical installation
Wiring
Connecting busbars
5.3.2
Connecting busbars
Fig. 5−4
Example: Connecting busbars
Proceed as follows to connect the busbars:
1. If devices of the interconnected system have already been in operation:
If necessary, switch off the supply system and wait until the discharge
time has elapsed (depending on the device, this may take up to 30
minutes).
Make sure that all power terminals are deenergised.
2. Loosen the busbar screws (do not remove them completely).
58
l
SSP94PN201
EDK94ZPP0364 DE/EN/FR/ES/IT 3.0

Publicité

loading