Télécharger Imprimer la page

Scell-it PREMIUM E-649RA Instructions page 6

Publicité

Les langues disponibles

Les langues disponibles

Assembly:
EN
Mount the parts (see par. disassembly) in a reverse order. On the
outer surface of the jaws /fig.2 - pos.4/ apply a drop of lubricating
FR
oil ( we recommend hydraulic oil grade HLP ISO VG 32), apply
thin layer of plastic lubricant MOGUL LV 2-3 to the suction
IT
pipe and «O» ring /fig.2 - pos.7,6/. Basic set-up of the jaws is
performed as in fig. no. 3.
3. GENERAL MAINTENANCE
General maintenance should be performed after about 500 000
strokes or once every three years. The whole tool must be completelly disassembled and all seals
and worn parts must be replaced. This repair may be carried out by an authorized technician only
or a person trained by the manufacturer or supplier.
SPARE PARTS
1. ORDERING
Order the spare parts exlusively from the manufacturer or from your sales agents.
The order must contain:
a) tool serial number
b) number of ordered part
c) number of pieces
d) name of your company and precise address
e) your tax identification number and identification number
2. LIST OF QUICKLY EXPENDABLE PARTS
Designation
Nose-piece 5
Nose-piece 6
Nose-piece 6.4
Nose-piece 6.4 monobolt
Clamping sleeve
STORAGE
The pneumatic-hydraulic tool embedded in a shipping container must be stored in
environment with relative humidity to 70% and temperature ranging from +5°C to +40°C,
without aggressive evaporation of salts, acids and caustics.
COMPLETE TOOL EQUIPMENT
Replaceable nose-pieces located in a plastic reservoir (Ø4.8/5.0, 6.0 et 6.4), jaws set, Operations
manual.
We recommend the customer to check completeness according the the above stated list (2.
LIST OF QUICKLY EXPENDABLE PARTS).
6 •
E-649RA - User Manual
Reference
E-NEZ-RA-50
E-NEZ-RA-60
E-NEZ-RA-64
D-1300165
D-1300103
FIG.3
Designation
Set of jaws
Conduit suction
Scraper ring
Nut HP
Mandrel container
Reference
S-1100153
S-1300503
D-1100301
D-1100401
S-1301400

Publicité

loading