EN
Installation
Notes
Installation
Sleeve
Orientation
Installation
Sleeve Setup
Installation Sleeve
Drainage
Ilumipod Inground Tri-12 IP Optic WW QRG
The Ilumipod Inground Tri-12 IP Optic WW consists of two parts, the
fixture housing and the concrete installation sleeve. The fixture housing is
IP67 rated, but the sleeve is intended to allow drainage. Read the
installation instructions carefully for the concrete installation sleeve
regarding leveling and drainage.
Run the AC power and signal cables into the concrete installation sleeve
and the fixture's housing. Do not use the fixture's junction box to extend
the power or signal cables to other units because this may compromise the
IP rating of the junction box. Instead, use individual cables from the fixture
to the corresponding distribution boxes.
Always keep the power cables away from the signal cables by running them
in different conduits and using separated distribution boxes.
Orient the installation sleeve to allow the signal cable to enter the sleeve
using one of the four cable inlets and the power cable to use the opposite
inlet, as seen in the figure. This will reduce the stress to the signal and
power cables when installing the fixture, while keeping them separated.
Power Cable
To Power
Distribution
Box
When setting up the installation sleeve, make sure that any water that may
have entered it can drain out of the sleeve on its own. Locate the installation
sleeve above the normal drainage level so the fixture does not become
submerged in more than 1 m of water during heavy rain.
In addition, make sure that the installation sleeve allows the stainless steel
collar to be level and flush with the ground surface to distribute the load
uniformly over the fixture's surface.
The Ilumipod Inground Tri-12 IP Optic WW can support a distributed load
of up to 3,000 kg (6,614 lbs) when properly installed.
Collar
Concrete
Drainpipe
Hardpan
5
Signal Cable
To Signal
Distribution
Box