Installation Location; Water Line Hook-Up - PUR P2QC8506BLS Manuel Du Propriétaire

Distributeur d'eau sans bouteille branché à la canalisation
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions (continued):

Installation Location:

Select a suitable location where the Water Dispenser will be installed, making sure you have easy access to an electrical wall outlet
and the household cold water supply line.

Water Line Hook-Up:

1. IMPORTANT: Turn off the household cold water supply line.
2. Open the cold water faucet allowing water to purge the system to minimize water leakage cleanup.
3. COPPER PIPE PLUMBING: Using a tube/pipe cutter, cut and remove a section of the cold water
line at the desired height. Cut should be made above any manual shut-off valve installed on the
water line.
4. Using an emery cloth, clean the ends of the copper pipes and apply a liberal layer of flux to both
the inside of the fitting and the outside of the pipe before sliding the two parts together that are
being soldered. Follow manufacturer's installation instructions provided with the 1/2" Male Solder
x 1/4" OD Compression Fitting Shut-Off Valve (B).
5. FLEXIBLE PIPE PLUMBING: Using a tube/pipe cutter, cut and remove a section of the cold water
line at the desired height. Cut should be made above any manual shut-off valve installed on the
water line. Follow manufacturer's installation instructions provided with the 1/2" x 1/2" x 1/2"
Quick-Grip Tee (D) and 1/2" Quick-Grip x 1/4" OD Compression Fitting Shut-Off Valve (E).
6. Close the newly installed Shut-Off Valve (Figure 1A and Figure 1B) and slowly re-open the cold
water supply line and check for leaks. If leaks are detected, immediately turn off the water supply
and repair any leaks. If no leaks are detected, proceed to step 7.
7. The Water Dispenser includes 1.8 meters (6 feet) of 1/4" OD Flexible Tubing. If additional
Tubing is needed, it can be purchased at your local hardware store. Cut the desired length to
suit your installation requirements, making sure both ends of the Tubing are cut straight/square
(Figure 1 & Figure 2). Remove the Compression Nut and Ferrule from the Valve and install them
onto the Tubing (Figure 3). Insert the Tubing into the Valve until it stops (Figure 4). Slide both the
Compression Nut and Ferrule toward the Valve and tighten the Compression Nut firmly using a
wrench (Figure 5). DO NOT OVERTIGHTEN.
Figure 1
Figure 4
5
Figure 2
Figure 5
Figure 1A
Valve Open
Figure 1B
Valve Closed
Figure 3
Figure 6

Publicité

Table des Matières
loading

Table des Matières