Installation Instructions - arietta DEKOR ISLAND 36 Guide D'instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions

Prepare Location
It is recommended that the vent system be installed before
hood is installed.
Before making cutouts, make sure there is proper clearance
within the ceiling or wall for exhaust vent.
Check your ceiling height and the hood height maximum
before you select your hood.
1.
Disconnect power.
2.
Determine which venting method to use: roof, wall, or nonvented.
3.
Select a flat surface for assembling the range hood.
Place covering over that surface.
WARNING
TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR IN-
JURY TO PERSONS, OBSERVE THE FOLLOWING
4.
Using 2 or more people, lift range hood onto covered
surface.
Ceiling Support Structures
This vent hood is heavy. Adequate structure and support must be
provided in all types of installations.
1.
At the hood location, install 2"x 4" cross framing between
ceiling joists as shown. (2"x 4" are required to support
the weight of the hood.)
2.
Arrange cross framing in the ceiling to suit the existing structure.
3.
Your ceiling joists will be like one of the following:
Example A
NOTE: Top view ceiling joists
parallel to front of hood
7
"
1
16"
16
(17.9cm)
(40.6 cm)
joist spacing
Example B
NOTE: Top view ceiling joists
parallel to front of hood
install cross-
16"
(40.6 cm)
duct/cooktop
joist spacing
Centerline
7
"
1
16
(17.9cm)
10
" (25.5 cm)
1
16
install cross-
framing
symmetrically over
duct/cooktop
Centerline
Ø 6
" (15.9
1
4
cm) duct
2 x 4 cross
framing
Align duct to
Cooktop
center of cooktop
outline
hood front
10
" (25.5 cm)
1
16
framing
symmetrically over
2 x 4 cross
framing
Ø 6
" (15.9
1
4
cm) duct
Align duct to
Cooktop
hood front
center of cooktop
outline
Example C
NOTE: Top view ceiling joists
parallel to front of hood
10
" (25.5 cm)
1
16
install cross-framing
symmetrically over
duct/cooktop
7
"
1
16
(17.9cm)
16"
(40.6 cm)
joist spacing
hood front
Installing the range hood
1.
Place the template in the ceiling considering the instructions
for ceiling support structures.
NOTE: Always consider the front of hood legend when playing
the template on the ceiling. It will define the control's location.
2.
Mark with a pencil the hole locations for screws and duct in
the ceiling.
3.
Fix the upper horizontal support with 4 - 5x45 mm screws.
5
Centerline
2 x 4 cross
framing
Ø 6
" (15.9
1
4
cm) duct
Align duct to
Cooktop
center of cooktop
outline

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Adi436ssa

Table des Matières