Télécharger Imprimer la page

DOREL Living DA7499E Mode D'emploi page 8

Publicité

Les langues disponibles

Les langues disponibles

TWIN/FULL BUNK BED
DA7499E / DA7499W / DA7499G
STEP 1
One of the headboard top crosses (F) has a label on it, do not use it in this step.
Insert stoppers (10) and top headboard slats (R) into each hole of the headboard
bottom cross (G) and push with a downward force to secure them into place.
Attach the headboard top cross (F) to the top headboard slats (R). Insert wood dowels
(9) into the ends of headboard top cross (F) and headboard bottom cross (G).
Attach top posts (A & B) with wood joint connectors (3). Use Allen key (13) to tighten
the joint connectors as shown.

Publicité

loading

Ce manuel est également adapté pour:

Da7499wDa7499g