Télécharger Imprimer la page

spalina SELONIA WAVE BT-62111M Mode D'emploi page 9

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5
4
3
2
11
• The floor should be able to sustain the weight.
• Install the bathtub according to the drawing
• Draining: A draining system shall be planned for the overflow. It's
recommended to position the draining hole as shown in the below
drawing. If not, the draining hole shall be within 200mm around the
ideal position and the diameter shall be less than 50mm. (Point D in
the drawing)
• Maintenance zone: Please leave a space of 500mm or more around
the bathtub for future maintenance. Do not install any fixed objects in
this area. (Point E in the drawing)
Product name
Bathtub
DETAILS OF THE BATHTUB
9
8
6
1
7
10
Voltage
Frequency
220-240V~
EN
iNSTALLATION
• Electrical connection: Warning: connect the three conductors of the
supply cable to a connection box IPX5 in respecting the polarities as
following:
- Live: Brown
- Neutral: Blue
- Earth: Yellow/Green
• If you are not sure, it's recommended to ask a qualified electrician
for help.
TECHNICAL DATA
Power
50Hz
1610W
1. Pillow
2. Water jet regulating knob
3. Water jet switch
4. Bubble switch
5. Light switch
6. Colored lamps
7. Drain hole
8. Backflow hole
9. Big water jet
10. Bubble nozzles
11. Small water jet
12. Skirt
IP
Water pressure
X5
0.2-0.6MPa
9

Publicité

loading

Produits Connexes pour spalina SELONIA WAVE BT-62111M