Installation And Start-Up; Electrical Connection - Lavor Vulcano Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22
UNPACKING
Take out the upper and the lower hooks, which fix the cardboard box to the pallet, take the
cardboard box off, put two wheels of the machine on ground and take the pallet off (see ref.2)
Ref.2

INSTALLATION AND START-UP

1ST START-UP
When starting up for the first time or after a long period
out of use, connect the intake line only for a few minutes
so that any dirt is vented from the delivery outlet.

ELECTRICAL CONNECTION

Check that the mains voltage is the same as that of
your machine, indicated on the technical data plate.
Your electrical system must be constructed by qualified
technicians capable of working in accordance with the
requirements of the regulations in force (earth
connection, fuses, differential security breaker, etc.).
In case of failure to comply with one of the
regulations stated above, the manufacturer declines
all responsibility for the staff and provides no
warranty.
16
Ref.3

Publicité

Table des Matières
loading

Produits Connexes pour Lavor Vulcano

Table des Matières