TP-Link EAP225 Guide D'installation page 6

Masquer les pouces Voir aussi pour EAP225:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English
4
Attach the EAP to the mounting bracket by
aligning ARROW 1 (on the EAP) with ARROW
2 (on the mounting bracket), then rotate the
EAP clockwise until it locks into place.
5
Feed the Ethernet cable through the hole and
set the ceiling tile back into place. Connect
the Ethernet cable to the ETHERNET port.
Option3 : Wall Mounting
Follow the steps below to install the EAP with the provided accessories:
M3×28 Plastic Wall Anchors
1
Attach the EAP to the mounting bracket by
aligning ARROW 1 (on the EAP) with ARROW 2
(on the mounting bracket), then rotate the EAP
clockwise until it locks into place.
2
Make two small pencil marks on the wall. Make
sure the two marks are level and should be
98.6mm apart. Drill two 6mm holes through
the center of your marks.
4
(Qty.4)
M3×20 Self-tapping Screws
(Qty.4)
98.6mm

Publicité

Table des Matières
loading

Table des Matières