INSTALLATION INSTRUCTIONS
D. DISASSEMBLY: The FRONT FRAME (J) and
BACK FRAME (K) come pre-assembled with ball
studs engaged in the receivers.
EN
•
To Separate the FRONT FRAME from the BACK
FRAME:
a) Place the assembly face down on a
b) At the location of the ball stud, insert
c) Repeat for each corner. See Figure 11.
E. BACK FRAME INSTALLATION: Position back
frame equal space top to bottom, side to side.
Mark for 4 holes, center punch and pre-drill with
1/16" [1.45 mm] drill bit. Secure frame with 4
SCREWS (G). See Figure 12.
MOUNTING HOLES
MOUNTING HOLES
6
©2019 Hestan Commercial Corporation
protected surface.
a flat head screwdriver between the
FRONT FRAME and the BACK FRAME
and gently pry up to disengage the ball
stud from the receiver.
Figure 11
MOUNTING HOLES
EQUAL GAP
SIDE TO SIDE
EQUAL GAP TOP, BOTTOM
MOUNTING HOLES
Figure 12
(CONT.)
F. FRONT FRAME INSTALLATION:
a) Place the FRONT FRAME (J) onto the BACK
FRAME (K) and align ball studs and receivers.
b) Secure the FRONT FRAME to the BACK
FRAME by firmly pushing the front frame
onto the back frame engaging the four (4)
snap attachments. See Figure 13.
SNAP
ATTACHMENT
Figure 13