Publicité

Please direct enquires to:
Yardmaster International
Cahore Road
Draperstown
BT45 7AP.
Tel: 028 7962 8449
INTERNATIONAL
Demandes de
renseignements à:
TRIGANO JARDIN
Service Commercial
Usine du Boulay
41 170 Cormenon
Mondoubleau
Tel: (02) 54 73 55 55
Bitte alle
Anfragen an:
I.D.B.
Oststraße 152
40210 Düsseldorf
Tel: 02 11 36 28 57
0112

Publicité

Table des Matières
loading

Sommaire des Matières pour Yardmaster 1017A

  • Page 1 0112 INTERNATIONAL Please direct enquires to: Demandes de Bitte alle Yardmaster International renseignements à: Anfragen an: Cahore Road TRIGANO JARDIN I.D.B. Draperstown Service Commercial Oststraße 152 BT45 7AP. Usine du Boulay 40210 Düsseldorf 41 170 Cormenon Tel: 02 11 36 28 57...
  • Page 15: Assemblage Des Poutres De Toit

    ROOF BEAM SUB-ASSEMBLY Separate and lay flat all roof beams, 50213, 50219 and all roof beam splice plates 50200. Place all roof beams in pairs and set back to back with the sloping sides facing down and away to form a "V" angle head. Overlap one of the 50219 roof beams with one of the 50213 roof beams on the second and third holes on each beam as shown.
  • Page 17 FRONT FRAME POST. Select one 41302 and one 41307, fix together as shown with the front frame braces; 41303 using screws (bag 1) and (bag 12). Repeat for other side of front frame. ALWAYS ENSURE HOLES TO LOCATE HINGES ARE TOWARD OUTSIDE OF FRONT FRAME.
  • Page 19: Assemblage De La Structure Arriere

    BACK SECTION ASSEMBLY. Overlap and attach two back base rails; 41101, to back intermediate base rail; 41104, on inside of either end of 41104 using screws (bag 1). Fix 2 standard uprights; 41301, as shown to centre of back base rail overlaps using screws (bag 2) and spire nuts (bag 10).
  • Page 21 BACK SECTION ASSEMBLY. Fix left/right back braces; 41201, and intermediate back brace; 41205 to centre hole in standard upright; 41301. Fit a 10118 wall panel to side of back section; starting from position: : 4th hole from edge of base rail, : 3rd hole along L/R back brace, using screws (bag 1) and washers (bag 12).
  • Page 23 BACK RIGHT SIDE SECTION Place base rails 41102, 41103 and base rail splice 41106 as shown and fix with screws (bag 1). Fix standard upright post; 41301, at centre of base rail splice 41106 using screws (bag 2) and spire nuts (bag 10).
  • Page 26 BACK RIGHT SIDE SECTION Overlap sidebeams; 50119 and 50113 as shown using 4 screws (bag 1). N.B. These may have to be removed later to facilitate fitting wall panels !!! Fix spliced sidebeam to standard upright; 41301 as shown with screws (bag 1) and spire clips (bag 10), 1300mm from notched edge of 50119.
  • Page 29: Structure Avant Droit

    FRONT RIGHT SIDE SECTION Position base rails; 41105, 41103 and side base rail splice 41106 as shown and fix with screws (bag Fix standard upright to centre of base rail splice 41106 using screws (bag 2) and spire nuts (bag 10).
  • Page 32: Assemblage De La Structure

    STRUCTURE ASSEMBLY Raise back section and fix right back section at base rails with screws (bag 1). Secure side and back braces with bolts and nuts (bag 9). Raise back left side and fix to back section in same manner. ALWAYS ENSURE SQUARENESS IN STRUCTURE ASSEMBLY.
  • Page 35 STRUCTURE ASSEMBLY Fix front frame assembly to garage frame and corner panel with screws (bag 1) and washers (bag 12). Fix roof truss sub-assemblies to all three opposite pairs of standard uprights. Fix front frame angles, 41604 to front frame and corner panel attachment, using screws (bag 1) and washers (bag 12) as shown.
  • Page 37: Assemblage Des Profiles De Toit

    ROOF FRAME ASSEMBLY Fix left hand gable 301, right hand gable 302 and centre gable 305.3 to the wall panels at the back of the garage with screws (bag 1) and washers (bag 12) use double spire clips (bag 13) on bottom edge of gables as needed (where 2 x 7mm holes occur) .
  • Page 40: Roof Assembly

    ROOF ASSEMBLY MOST IMPORTANT! BEFORE FITTING THE ROOF PANELS CHECK YOUR BUILDING FOR SQUARENESS BY ENSURING THAT THE DIAGONALS ARE EQUAL. Starting at the rear of the building fit roof panels 203.29 and 204.29 over gable flanges (panel should overlap gable by 75mm) and fix with screws (bag 1) and washers (bag 14) to gables, roof beams and sidebeams on each side of the building.
  • Page 43 RIDGE CAP COVER FITTING.GUTTER ANGLE FITTING.GUTTER END CAP FITTING. Fit ridge cover caps 507 over the end of the ridge cover ensuring that the bottom edge of 507 is under the overhang of the roof panels. Fasten through the ridge cover into the roof panels using screws (bag 2), washers (bag 14) and spire clips (bag 10).
  • Page 45: Fixer L'abri Dans Le 13 Positions Montres Avec Le Kit D'ancrage Prevu. M8 X

    ANCHORING GARAGE. Anchor garage in the 13 positions shown with anchor kit provided (M8 x 50 coach screws plugs and washers). Holes to locate are punched in the base rails. Positions: 2 in front frame, 4 along each side, 3 along rear POSITION OF GARAGE MUST BE DETERMINED AT THIS POINT AND SQUARNESS MUST BE ENSURED.