Keep exchanged lamp in a protective container and remove accordingly.
During the operation, the lamp reaches temperatures of up to 725° C.
Before replacing the lamp, unplug mains lead and let the lamp cool down (approx. 10 minutes).
During the installation do not touch the glass-bulbs bare-handed! Please follow the lamp manufacturer's
notes!
Do not install lamps with a higher wattage! Lamps with a higher wattage generate temperatures the device
was not designed for. Damages caused by non-observance are not subject to warranty.
Procedure:
Step 1: Unscrew the fixation screws of the lamp cover and remove it.
Step 2: Open the two knurled-head nuts.
Step 3: If replacing the lamp, remove the old lamp from the lamp holder.
Step 4: Insert the lamp into the lamp holder and fix it with the knurled-head nuts.
Step 5: Replace the lamp cover and tighten the fixation screws.
Please note: Lighting units should be fitted with splinter protection. If defective, please dispose of the
unusable lamp in accordance with the current legal regulations.

Installation

This device is constructed for a standing installation only.
Before attaching the device, make sure that the installation area can hold a minimum point load of 10 times
the device's weight.
The device must only be installed absolutely planar at a vibration-free, oscilation-free and fire-resistant
location. Make sure that the device is installed absolutely planar by using a water-level.
The device must be installed out of the reach of people.
The device must always be installed via all fixation holes. Do only use appropriate screws and make sure
that the screws are properly connected with the ground.
The durability of the installation depends very much on the material used at the installation area (building
material) such as wood, concrete, gas concrete, brick etc. This is why the fixing material must be chosen to
suit the wall material. Always ask a specialist for the correct plug/screw combination indicating the maximum
load and the building material.
Procedure:
Step 1: On the baseplate, there are the holes for the installation.
Step 2: Hold the baseplate onto the location where the device is to be installed.
Step 3: Mark the boreholes with a pen or a suitable tool.
Step 4: Drill the holes.
Step 5: Hold the baseplate in the desired position and tighten it.
Do not operate this device with opened lamp cover!
Never switch the safety switch off!