Sojag 500-4155907 Guide De L'utilisateur page 34

Table des Matières

Publicité

ASSEMBLY
Step 13
13.1 Start installing the first roof finishing bars (I)
by inserting a screw (T) into the left pre-drilled
hole and the roof bar (C). Do not place a finishing
end (L) at this moment as it will be installed at
the end of this step.
13.2 Move to the right end of this roof finishing
bars (I). Align the right pre-drilled hole, a
pre-drilled hole found on a second roof
finishing bar (I) and a finishing end (L) and
secure with a screw (T).
13.3 Continue this process for installing all the roof
finishing bars (I) around the shelter. Refer to
the illustration. Your last step will be to unscrew
the first screw (T) you inserted in order to install
the last finishing end (L).
Parts required for this step / Pièces requises pour cette étape :
34
I
8
ASSEMBLAGE
Étape 13
13.1 Débuter l'installation de la première barre de
finition de toit (I) en insérant une vis (T) dans le
trou prépercé de gauche et visser à la barre de
toit (C). Ne pas placer un embout de finition (L)
à ce moment, car il sera installé à la fin de
cette étape.
13.2 Déplacez-vous vers la droite de la barre de
finition de toit (I). Enligner le trou de droite
prépercé avec le trou de gauche d'une deuxième
barre de finition de toit (I). Ajouter un embout de
finition de toit (L) et attacher en utilisant une vis (T).
13.3 Continuer ce procéder tout le tour de l'abri jusqu'à
l'installation de la première barre de finition de
toit (I). Dévisser la première vis (T) installée dans
le but de pouvoir y ajouter un embout de finition (L)
et visser à nouveau avec la vis (T).
L
© Sojag inc. 2014
8
T
8

Publicité

Table des Matières
loading

Table des Matières