Operation; Cold Weather Operation - GreenWorks Commercial GL 20 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATION

CHECKING BATTERY CAPACITY
Note: The battery is not shipped fully charged. It is recommended to fully charge before
first use to ensure that maximum run time can be achieved. This lithium-ion battery will not
develop a memory and may be charged at any time. A fully discharged battery pack will require
approximately 30 minutes to fully charge from a discharged state.
Press the battery capacity indicator (BCI) button. The lights will illuminate according to the
batteries capacity level. See chart below:
BATTERY CAPACITY
INDICATOR (BCI) BUTTON
BATTERY PROTECTION FEATURES
GW 82V lithium-ion battery packs are designed with features that protect the lithium-ion cells and
maximize battery life.
If the tool stops during use, release the trigger to reset and resume operation. If the tool still does
not work, the battery needs to be recharged.

COLD WEATHER OPERATION

The lithium-ion battery pack can be used in temperatures down to -20°C(-4°F). Put the battery
pack on a tool and use the tool in a light duty application. After about a minute, the pack will
warm up and begin operating normally.
Lights
4 Green Lights
3 Green Lights
2 Green Lights
1 Green Light
Lights go out
Capacity
The battery is above 80% capacity
The battery is between 80% and 60% capacity
The battery is between 60% and 40% capacity
The battery is between 40% and 25% capacity
The battery is less than 25% capacity and
requires charging immediately
7
LIGHT METER

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gl 250Gl 300Gl 400Gl 500

Table des Matières