Unit Dimensions; Installation Clearances - GE UUY60ZGDAA Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions

Unit Dimensions

Model
UUY24ZGDAA
UUY36ZGDAA
UUY48ZGDAA
UUY60ZGDAA

Installation Clearances

24" clearance is required for filter, coil, or blower removal and service access.
The air handler can be installed in a closet with a false bottom to form a return air plenum or be installed with a return
air plenum under the air handler.
8
H
Dimension
W
D
21-1/4(540)
21-1/4(540)
24-3/4(630)
21-1/4(540)
A
B
W
D
H
48-1/4(1224)
57(1448)
A
B
11-5/8(295)
20(508)
11-5/8(295)
20(508)
31-5000486 Rev. 2

Publicité

Table des Matières
loading

Table des Matières