Electrical Connection - Sentiotec QUBE-090 Instructions De Montage Et Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 54
Installation instructions, only for experts

4.6. Electrical connection

1. Unscrew the screws 2 and 3 with a screwdriver.
2. Remove the cover panel 1.
Connection of Qube 9 kW and 10.5 kW
(QUBE-090 / QUBE-105)
1. Guide the connection cable through the
feed-through 4.
2. Connect the connectors of the connection
cable to the U – V – W – N – PE terminals
of the sauna heater and to the applicable
control device terminals. Observe the in-
stallation instructions for the control device
when doing so.
3. Reattach the cover panel 1 to the heater.
WORLD OF WELLNESS
p. 17/26
1
2
EN
3
U
V
W
N
PE
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Qube-105Qube-120Qube-150

Table des Matières