Digitus DN-170110 Mode D'emploi page 7

Masquer les pouces Voir aussi pour DN-170110:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22
1. Inspection
Remove the UPS from its packaging and inspect it for damage that
may have occurred during shipping. If any damage is discovered,
repack the unit and return it to the place of purchase.
2. Charging
This unit is shipped from the factory with its internal battery fully
charged. However, some charge may be lost during shipping and the
battery should be recharged prior use. Turn on the UPS, plug the unit
into an appropriate power supply and allow the UPS to charge fully by
leaving it plugged in for at least 6 hrs with no load (no electrical
devices such as computers, monitors, etc.) connected.
3. Placement
Install the UPS unit in any protected environment that provides
adequate airflow around the unit, and is free from excessive dust,
corrosive fumes and conductive contaminants. Do not operate your
UPS in an environment where the ambient temperature or humidity
is high.
On the other hand, place the UPS away from the monitor at least
20cm to avoid interference.
6 hours
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dn-170111

Table des Matières