WS and ATP Series Passive Infrared Occupancy/Vacancy Wall Switch Sensors
SPECIFICATIONS (WS2000, ATP2000, ATP2004 models)
• 1200 sq. ft coverage area
• Electrical Ratings :
120VAC – 800W Incandescent, 8.3A Ballast
277VAC – 6.5A Ballast
• Adjustable Time Delay (WS series): 30 seconds to 30 minutes
• Automatic Time Delay (ATP series): 4 to 30 minutes based on
room occupancy patterns
• Light Level Adjustment: 10 - 500+ fc
• Zero-Cross Switching Circuitry
• UL Listed
• Both Neutral and Ground wire versions available
• Auto/Manual ON Mode, Multi-Way function
SPECIFICATIONS (WS1000 models)
• 1200 sq. ft coverage area
• Electrical Ratings:
120VAC – 500W Incandescent, 4.16A Ballast.
• Adjustable Time Delay: 30 seconds - 30 minutes
• UL Listed
• Vacancy (Manual ON) models available
PRECAUTIONS
CAUTION: RISK OF ELECTRICAL SHOCK. Turn power off at
service panel before beginning installation. Never wire energized
electrical components.
CAUTION: USE COPPER CONDUCTOR ONLY.
NOTICE: For indoor use only.
NOTICE: For installation by a licensed electrician in accordance with
National and/or local Electrical Codes and the following instructions.
NOTICE: Confirm that device ratings are suitable for application prior
to installation. Do not install if any damage to product is noticed.
INSTALLATION
1. Turn power off at the service panel.
2. (For new installation) Select a suitable location for the sensor.
Make sure the sensor will not be blocked by doors or other
obstacles. In addition, make sure the sensor will not detect motion
in adjacent areas or hallways causing the lights to turn on when
not desired. The sensor should have a line of sight view of the
occupant's hands for best performance. Note the area of coverage
diagram. Mount the sensor 42" to 54" (107-137 cm) from the floor.
(For existing switch installation, remove old switch and replace
with sensor.)
3. Wire the sensor(s) as shown in the wiring diagrams.
Connect BLACK wire to HOT or LINE conductor.
Connect WHITE wire to NEUTRAL conductor. (Neutral models only)
Connect RED wire to lighting LOAD conductor.
Connect GREEN wire to equipment grounding conductor, "GND".
(Green, Green/Yellow or Bare wire) Ground wire power sensors
must be securely connected to ground to operate.
For multi-way applications (ATP/WS2000xx), connect the YELLOW
wires from each sensor. Connect a RED wire from only one sensor to
load. Cap RED wire on other sensor.
4. Install sensor in wall box using mounting screws provided.
5. Restore power to the sensor and allow it to initialize (up to 45 sec).
6. If it is desired to change settings, remove the sensor's front button
cover and see time delay and daylight control settings.
7. Install wall plate.
Operation
Wiring Device-Kellems
40 Waterview Drive
Shelton, CT 06484
(800) 288-6000
www.hubbell-wiring.com
PD2547
Page 1
H-MOSS
Motion Switching System
®
Installation and Operating Instructions
03/13
Top View / Vue en plan / Vista por encima
Major Motion / Mouvement fréquent / Movimiento frecuente
Minor Motion / Mouvement occasionnel / Movimiento ocasiona
Side View / Vue de côté / Vista lateral
Floor/Plancher/Piso
0' [m]
20' [6,1 m]
WS2000
WS1000
WS2000N
WS1000N
WS2004
WS1001
WS2004N
WS1001N
12' [3,7 m]
16' [4,9 m]
40' [12,2 m]
ATP2000
ATP2000N
ATP2004
ATP2004N
l
®