Installation De Plan De Travail / Lavabo - GAMADECOR UP Série Instructions D'assemblage Et D'installation

Table des Matières

Publicité

6. WORKTOP INSTALLATION / SINK
1. Apply a bead of silicone adhesive to the rim of the
vanity.
2. Place the worktop / sink.
3. Apply a bead of silicone adhesive on the top back
edge of the vanity top and the wall that the vanity meets.
1
2
Nova sink
1
Krion® worktop installation
1
Overmounted sink
4. Clean up any excess silicone.
5. Mount the overflow and drain.
6. Connect the trap to the drain assembly; hand tight to
check alignment.
7. Connect hot and cold supply lines to the shut off val-
ves. Tighten trap joints for watertight assembly.
8. Insert drawer.
6. INSTALACIÓN DE ENCIMERA / LAVABO
1. Aplique una tira de silicona al borde del mueble.
2. Coloque la encimeara / el lavabo.
3. Aplique una tira de silicona entre el borde posterior
superior del mueble y la pared.
3
2
2
4. Limpie cualquier exceso de silicona.
5. Monte la válvula y el sifón.
6. Conecte la sifón al conjunto de desagüe; apretar con
la mano para verificar la alineación.
7. Conecte las tomas de agua fría y caliente. Apriete las
juntas para un ensamblaje hermético.
8. Inserte el cajón.
4
3
6 / 11

6. INSTALLATION DE PLAN DE TRAVAIL / LAVABO

1. Appliquez une bande de silicone sur le bord du meu-
ble.
2. Placez le plan de travail / évier.
3. Appliquez une bande de silicone entre le bord arrière
supérieur du meuble et le mur.
5
3
4
4. Essuyez tout excès de silicone.
5. Monter le clapet et le siphon.
6. Connectez le siphon à l'ensemble de vidage; serrez à
la main pour vérifier l'alignement.
7. Connectez les entrées d'eau froide et d'eau chaude.
Serrer les joints pour un assemblage hermétique.
8. Insérez le tiroir.
IM-GD-424
26 / 11 / 2020

Publicité

Table des Matières
loading

Table des Matières