cleaning
After operation, pull out drainage cap from the bottom of the tank, and drain out the remaining paste.
The Pasting roller is taken out by lifting up both sides of the roller together.
The Pickup roller is lifted on the right-hand side first to release it from the leaf spring then pull it out
of the hole in the left-hand bearing.
Wash both rollers in a bucket. Dry them and lay them down on a dropcloth to prevent damage.
Main body (tank) should be washed well, separate from the pasting roller. Other parts also must
be cleaned.
Wipe machine clean and dry.
The life capability of your machine depends on thorough cleaning.
Fig. 8
guide plate
Fig. 9
roller bushing (2)
pasting roller
pick up roller
drainage cap
pick up roller
roller bushing (1)
advance-equipment.com
stoRage anD tRansPoRt
Remove material support bar from machine.
If booking table is used, remove boards and two brackets in sides of rolling stand.
Clean paste tank and rollers as previously instructed.
Close lid and lock both latches.
Legs can be folded with or without caster assembly in place.
If you want to remove them, loosen from locking screws first. If not, make sure that all four
screws are tight.
Pull out locking pin from leg brace on one end.
Lift machine at this end and fold against bottom of tank. Do the same on other end.
Put stainless steel cover on machine and wrap bungee cords around tank and cover to hold it in place.
The machine may now be stored or transported.
Fig. 10
lid latch
booking table brackets
locking pin
brace
locking screws
caster assembly
leg assembly
Page 11