Installation Instructions
2-105/106/107 SOMERSET
RECOMMENDED TOOLS & MATERIALS
(not supplied)
BEFORE YOU BEGIN
Putty knife/
Hacksaw/
This manual covers the installation and main-
Couteau à mastic
Scie à métaux
tenance of your new Crane Plumbing bath.
Read it through once before proceeding. After
Tape measure/
Pipe Wrench
Ruban à mesurer
Clé à tuyau
installation the manual should be left with the
bath and consulted by the user.
Screwdrivers/
Caulking/
Acrylic/FRP products have a high quality sur-
Tournevis
Calfeutrant
face finish. Carefully inspect unit upon arrival.
Any shipping damage or shortage should be
Adjustable Wrench/
Plumbers Putty/
Level/
recorded and the carrier notified. Protective
Clé à molette
Mastic à plomberie
Niveau
storage should be provided for these fixtures.
Avoid exposing to excessive heat. Keep fixture
Vise Grips/
Hammer/
in carton until ready for final installation.
Pince-étau
Marteau
When moving shower or bath units with a handtruck they should be centred with the
back to the rear; avoid loading or flexing the wall panels.
Care must be taken to protect the surface during handling and installation. NEVER
LIFT ANY PRODUCT BY THE GRAB BAR OR WHIRLPOOL/THERAPEUTIC PIPING
OR COMPONENTS. If the unit is covered by a thin plastic film it should be removed
after final installation or prior to joining two surfaces that will be in permanent contact.
Consider the following when determining the tub location:
Will the floor be able to support the tub when filled?
An access panel should be provided for supply fittings, pump and blower (if provided).
That the dimensions of the product match those in the plan.
A wall timer must be installed out of reach of a person in the tub (whirlpool/therapeutic only).
INSTALLATION
1
Install the drain and overflow fitting on the bath in accordance with the manu-
facturer' s instructions.
2
To install any deck mounted fittings on the bath, consult the manufacturer' s
instructions. To drill holes in the deck, extreme care should be taken. Carefully
measure and mark the desired locations of the faucet centers. Apply masking
tape to the area to minimize chipping. Using a hole saw with a centering bit,
slowly drill through the bath surface from the show side.
SUNKEN INSTALLATION
3
Construct a suitable installation island similar in dimension as shown in fig. A
2-105 58-5/8" [1490]
2-107 64-5/8" [1642]
2-106 70-1/8" [1781]
4
Position the bath in the installation area and check the level of the unit in both
length and width. Ensure the tub rests solidly on the installed supports. Shim the
bath as required to ensure a level installation.
5
Remove the bath from the installation area and prepare a mortar mix to anchor
the tub. Trowel the mortar into the footing area of the bath and lay a 2 mil poly-
ethylene sheet over the mass. Reset the bath into position on top of the plastic
sheet, and firmly press into place.
6
Complete the attachment of the waste piping to the drainage plumbing.
7
Secure the bath in its final installed position. Silicone caulk the exposed edges of
the tub.
8
For units requiring electrical hook-up, a separate dedicated 115 VAC, 15 Amp
circuit must be wired to the installation. Electrical codes also require a Class A
Ground Fault Circuit Interrupter (GFCI) be installed. Refer to the enclosed
equipment specific wiring instructions included with this unit.
HYDROMASSAGE
115 volts
3/4 HP rating
Single phase
9.9 amps,
S.F. = 1.0
Protect circuit with
G.F.I. class "A"
THERAPEUTIC
110 volts
1 HP rating
Single phase
7 amps,
Protect circuit with
G.F.I. class "A"
32¾" [832]
17¼" [440]
Soak/Whrl
19½" [495]
Therp.
*2
3
"
/
8
(60 mm)
1
"
/
(3 mm)
8
2-105
A 30"
B 20 "
C 44 "
CARE OF SURFACE AND CLEANING
To protect glossy finish of tub follow our cleaning instructions. Do not use metal scrapers. wire brushes
or other metal tools to remove foreign material from tub. Use a sharp softwood stick to scrape off plaster.
Use turpentine or paint thinner to remove paint spots. Never use an abrasive cleaner. For regular clean-
ing use a non-abrasive powdered detergent such as Spic and Span. For stubborn stains use warm water
and a liquid detergent such as Handy Andy, Mr. Clean or Lestoil. Solvents such as turpentine or paint
thinner may be used without harming surface. Scouring pads of nylon, saran or polyethylene containing
no hard abrasives may be used. Restore dulled areas by rubbing with an automotive type cleaning/rub-
bing compound such as Dupont No. 7 followed by an application of liquid wax such as Johnson' s . Do not
use acetone, lacquer thinner, nail polish remover, or other strong solvents on bath finish.
WARRANTY
Crane Plumbing Corporate plumbing fixtures are warrantied to be free from defects in material
or workmanship under normal use and service for a period of one year from installation or two
years from manufacturing date, whichever comes first. If during that time material is found to
be efective as a result of manufacturing product will be replaced at no charge. Crane Plumbing
Corporation will not be liable for any labour, consequential or other charges in connection with
replacement of defective products, or parts, or any portion thereof.
Pump access through wall or frame
Depth
5 "
(00 mm)
A
C
2 holes
1
1
/
2 (38 mm)
1 holes
1
(25 mm)
B
4"
(102 mm)
8"
(204 mm)
1
1
/
"
(32 mm)
6
1
4
/
2
Drain through floor
(161 mm)
SUNKEN VERSION
INTEGRAL TILE FLANGE VERSION
1
17
/
"
Bowl depth:
2
35"
(890 mm)
1
1
/
"
4
Outside frame ref.
(32 mm)
33
7
"
3
/
(860 mm)
33
/
"
8
(857 mm)
4
Tub
Tub
Rough floor
3
*2
/
"
8
(60 mm)
1
2 x 4 Frame
Shims or mortar
/
"
8
(3 mm)
2-107
2-106
A 30"
A 30"
(762 mm)
(762 mm)
(762 mm)
B 21
1
/
B 21 "
(508 mm)
2
(546 mm)
(533 mm)
* Therapeutic models only
C 56 "
C 50 "
(1118 mm)
(1422 mm)
(1270 mm)
"
1"
(25 mm)