Wayne SWS50-1/2 HP Instructions D'utilisation page 4

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operating Instructions and Parts Manual
Installation
(Continued)
1. Shut off the power to the pump.
2. Open the faucet nearest the tank and
allow all water to drain from the tank.
3. Measure the tank precharge at the
valve stem using a tire pressure gauge.
4. If necessary, precharge with an air
pump to 28 - 30 psi on 1/2, 3/4 and 1
HP pumps.
5. Slope the horizontal pipes upward
toward the pump to prevent trapping
air. If the horizontal distance
exceeds 25 feet, see Chart 2 for the
recommended pipe size.
Electrical
Risk of electrical
shock. This pump is
designed for indoor installation only.
The voltage of power supply must match
the voltage of the pump. All above
ground well pumps except SWS50BOOST
have dual voltage motors preset at the
factory to 115 volts. The motors can be
converted to 230 volts by turning the
voltage selector to the desired voltage
(See Figure 7). Use a needle nose pliers
to pull the selector out approximately
1/4", rotate and then reinsert in correct
230 V
115 V
115 V
Figure 7 - Voltage Selector
position.
Select the proper size wire and
fuse (Chart 3). Time delay fuses are
recommended over standard fuses for
motor circuit protection. All pump
motors have built-in automatic overload
protection that will prevent damage to
the motor due to overheating.
Do not connect to
electric power supply
until unit is permanently grounded.
Connect ground wire to approved
ground then connect terminal provided.
A metal underground water pipe or well
casing at least 10 feet long makes the
best ground electrode. If plastic pipe or
insulated fi ttings are used, run a wire
directly to the metal well casing or use
a ground electrode furnished by the
power company.
www.waynepumps.com
Ground
Screw
Figure 8 - Electrical Connections
There is only one proper ground
terminal on the unit. The terminal(s) is
located under the pressure switch cover,
is painted green and is identifi ed as
GRD. The ground connection must be
made at this terminal (Figure 8). The
ground conductor must not be smaller
than the circuit conductors supplying the
motor.
pressure from the system before
attempting to install, service, relocate or
perform any maintenance.
Operation
PRIMING THE SHALLOW WELL PUMP
start motor until pump has been fi lled
with water.
1. Remove prime plug (Figure 4 or 5).
2. Fill pump and piping completely full
of water.
3. Replace the prime plug.
4. Open a faucet to vent the system.
5. Start the motor. Water will pump in
230 V
a few minutes. If pump fails to prime
in 5 minutes, stop motor and refill
pump with water. Priming time is
proportional to the amount of air in
inlet pipe.
6. Let the system operate for several
minutes to flush all pipes.
HP
1/2
3/4
1
Motor
Line
Disconnect power
and release all
To prevent damage
to the pump, do not
CHART 3 - RECOMMENDED FUSE & WIRING DATA - 60 HZ MOTORS
0
to
50
VOLT
115
15
230
10
115
15
230
10
115
20
230
10
4
Shallow Well Model Systems
7. Close faucet and allow pump to build
pressure in tank. When the pressure
reaches the cut-out setting, the
motor will stop.
The system is now in operation and will
automatically cycle on demand.
Maintenance
Disconnect power
and release all
pressure from the system before
attempting to install, service, relocate
or perform any maintenance. Lock the
power disconnect in the open position.
Tag the power disconnect to prevent
unexpected application of power.
Protect the pump
from freezing during
winter conditions.
DRAINING THE PUMP
Drain openings are provided on all
models. To drain the pump:
1. Remove drain plug and prime plug to
vent the system.
2. Drain all piping to a point below the
freeze line.
DRAINING THE TANK
Conventional tanks can be drained by
opening an outlet at the lowest point
in the system. Remove plug or the air
volume control to vent the tank.
Precharged tanks force virtually all
the water from the tank when system
pressure is released. No draining is
necessary.
RESTARTING PUMP
If the pump has been serviced, drained
or has not been used for some time,
be sure there is water in the pump
housing (volute) and the piping to the
well. There must be water in the pump
housing (volute) at all times when
the pump is running to avoid internal
damage of seal members (Priming the
Shallow Well).
Distance in Feet
From Meter to Motor
51
101
to
to
100
200
Wire Size
14
14
14
14
14
14
14
14
12
12
14
14
201
to
300
10
14
8
14
8
14

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sws75-3/4 hpSws100-1 hp

Table des Matières