Samsung DVE45T6200 Série Manuel D'utilisation page 30

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
STEP 6 Power on (for gas models)
Make sure all gas connections, the exhaust line, and all wiring is connected correctly. Then,
plug the power cord into a power source and check the dryer's installation and operation
using the final checklist in Step 7 below.
STEP 7 Final Check
When installation is complete, confirm that:
• The dryer is plugged into an electrical outlet and grounded properly.
• The exhaust ductwork is connected, and the joints are taped.
• You have used rigid or stiff-walled flexible metal duct material, not plastic flexible duct.
• The dryer is level and is sitting firmly on the floor.
• The dryer starts, runs, heats, and shuts off properly.
• The gas is supplied properly with no leaks (For gas models only).
CAUTION
The burner may not ignite initially due to air in the gas line. Allowing your dryer to
operate on a heat setting will purge the line. If the gas does not ignite within 5 minutes,
turn your dryer off and wait 5 minutes. Be sure the gas supply to your dryer has been
turned on. To confirm gas ignition, check the exhaust for heat.
30
English
Untitled-3 30
2020-02-13
1:01:18

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dveg45t6200 série

Table des Matières