Screen Research FCIN1 Manuel D'installation page 27

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 8
Manual
8
Install the fabric on the screen.
SCREEN WITH BLACK BACKING: install as first the black backing.
1- Prepare the ladder or the scaffolding on the front of the screen, put the rolled fabric on the
upper profile of the screen and fixed to the profile with 3 elastics: 1 in the centre and 2 near
the corners, after that unroll the fabric.
POSITION THE FABRIC IN THE CENTRE OF THE HORIZONTAL PROFILE
In order to facilitate the installation of the fabric in the center of the fabric and in the center of the
horizontal profile you can find a red stamp. (ths when you have odd profiles, if are even the center is
the connection of the profiles)
Made by Adeo Screen Sp. Z o.o. (Poland) Specifications are subject to change without notice. E&OE
Please verify that you are working with the latest revision of this document before specifying your screen.
Doc: FCIN1 Installation Manual rev2 | 01.01.2018
Page 27

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pfixfcin1

Table des Matières