2. LEVELING
Once the unit is in position, ensure its level is adjusted in both directions for proper draining. Leveling must be done with
the adjustable feet located beneath the unit. Adjust the feet so that they are ¼" [6 mm] above the bottom rim of the bathtub.
The bathtub's weight should be supported by the feet, not the rim.
3. LA BAIGNOIRE DOIT ÊTRE TESTÉE
Avant de terminer l'installation, la baignoire doit être testée; remplir la baignoire jusqu'au drain de débordement et vérifier
s'il y a des fuites. S'assurer que les raccords des tuyaux sont bien serrés.
3. OBLIGATORY TEST
The bathtub must be tested before installation is completed. Fill the tub to the overflow and inspect it for leaks. Tighten any
loose connections.
4. APPLIQUER UN JOINT DE SILICONE SOUS LA BAIGNOIRE.
4. APPLY A SILICONE SEAL UNDERNEATH THE BATHTUB.