ASSEMBLY
NOTE:
The netting and the curtain should be installed starting in the
middle of the 12 feet side of the unit, and finish the installation
in the middle of the next side of the unit. The zippers to close the
netting will therefore meet in the center of the each side of the
sun shelter.
Step 10
10.1 Install the mosquito netting (Y) along the inside
tracks by inserting the hooks (T) one at a time
into the eyelets found along the top border of
the netting. Repeat for all four netting panels (Y).
10.2 Install the curtain (X) along the outside tracks by
inserting the hooks (T) one at a time into the
eyelets found along the top border of the curtain.
Repeat for all four curtain panels (X).
Parts required for this step / Pièces requises pour cette étape :
22
ASSEMBLAGE
NOTE :
Les moustiquaires et les rideaux doivent être installées en
commençant par le milieu d'un côté de 12 pi de l'abri et en se
terminant au milieu du côté adjacent. Les fermetures éclair vont
alors se rencontrer au centre de chacun des côtés de l'abri.
Étape 10
10.1 Installer les moustiquaires (Y) sur les rails intérieurs en
insérant les crochets (T), les uns après les autres,
dans chacun des oeillets. Répéter cette étape pour
les quatre moustiquaires (Y).
10.2 Installer les rideaux (X) sur les rails extérieurs en insérant
les crochets (T), les uns après les autres, dans chacun
des oeillets. Répéter cette étape pour les quatre
rideaux (X).
Y1
4
X
4
© Sojag inc. 2015
Y
4