General Instructions - Novoferm NovoDock L730i Notice De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

2. General instructions

Read this first!
EN
The area of application of this level-
ler is described in the EN 1398 stan-
dard.
Installation, repairs, maintenance
and
dismantling must be carried
out by qualified professionals.
During commissioning, the qualified
technician doing the work must be
alert to possible hazards and check
that the leveller operates correctly.
++ WARNING +++ WARNING +++ WARNING ++
2.1
General instructions
Please read the installation manual
completely before using the product for
the first time! Take note of the
comments and comply with the safety
notices and warnings!
Warning
When performing all installation
tasks, switch off the power supply
and secure the system to prevent it
from being switched on by an autho-
rised person.
During installation, parts can drop,
which may result in injury to people
and damage to goods.
Contact with electrically live compo-
nents may result in electric shock.
Make sure that the customer's elec-
trical system has been installed in
accordance with valid safety requi-
rements.
Never connect a mains voltage sup-
ply to thecontrol unit; this will result
in irreparable damage to the elect-
ronics.
Only perform welding and grinding
tasks on the leveller if expressly
permitted in the position in question.
Ensure adequate ventilation in order
to prevent build-up of an explosive
atmosphere of dust and other
combustible materials.
+ WARNING +++ WARNING +++ WARNING ++
Make sure that all generally acknowledged
legal and other binding regulations for the
prevention of accidents and protection of the
environment, national regulations and ack-
nowledged engineering and technical rules
for safe and correct execution of the work
are observed.
Check that the fasteners and fixing
materials provided are suitable for the
site conditions. Only use suitable
fasteners and fixing materials.
Perform each step in sequence in
accordance with the installation
drawings!
2
Only use proper and suitable tools!
Only work on the leveller when it has
been made non-operational.
Failure to observe these precautions
may result in serious injury and material
damage!
The components that are to be used are
manufactured from high-grade, durable
and solid materials. Even so, care must
be taken during installation in order to
avoid damage.
If parts suffer damage, always replace
them with OEM parts. If you fail to do so,
correct operation of the leveller can no
longer be guaranteed! Furthermore,
this voids the warranty!
2.2
Check the following before installation:
Check the following items before installation:
Does the electrical supply that is
available correspond to the requirements
for the leveller?
Are suitable cables and fuses available?
In the case of models that are to be
installed in a prepared pit: Does the pit
correspond to the relevant installation
drawings and has an empty conduit
measuring 70 mm in diameter been
provided to allow insertion of the cable?
Only start installation work if all of the
conditions are satisfied.
To check dimensional accuracy, measure
the length and width of the pit, the height of
the front and rear sides and the diagonals.
The length of the diagonals (X) may not differ
from each other by more than 10 mm.
Instruction: The leveller must be installed so
that it is perfectly horizontal across its
width. If not, leveller operation may be
adversely affected. There is also a risk of
damage to the leveller.
2.3
Tools required for installation
You require the following tools for the instal-
lation work:
ESAB caddy 200 (5-200A) welder
(typical example).
ESAB OK 48.00 3.25
(typical example).
Lifting equipment
2.4
Forklift truck: Lifting capacity of at least
35 kN, fork length 2000 mm, or
Crane: Lifting capacity of at least 35 kN
in the area where work must take place.
This installation manual must be given to the customer and kept safely during the entire period of use!
2.5
Electrical connections
Cable: 7 x 0.75mm²
Motor cable: 4 x 1.5mm²
2.6
Functional check
Check all operating modes of the level-
ler upon completion of the installation
work. To do so, use the leveller test
report.
Fill out the test report truthfully and
sign the entry.
After doing so, hand this installation
manual together with the other docu-
ments to the customer.
A malfunctioning leveller may cause
personal injury and material damage to
goods. Only use the leveller when in pro-
per operating condition.
+ WARNING +++ WARNING +++ WARNING ++
2.7
Commissioning
The leveller may only be used for the
first time after handing over the decla-
ration of conformity.
Give the users instruction in how to
operate the leveller. Do not allow third
parties (e.g. visitors) to operate the
leveller.
This installation manual must be given
to the customer and kept safely during
the entire period of use!
Do not make any changes to the software
for the programmable control unit.
Changes or additions to the product that
has been delivered may only be made by
the supplier.
X1 = X2
(± 10 mm)
welding rod
Movements performed by the leveller
may cause injury to people and damage
to goods.
Make sure that no people or objects
are in the vicinity of the leveller
when it is moving.
Never use the leveller to raise people
or objects.
++ WARNING +++ WARNING +++ WARNING ++
Warning
Warning

Publicité

Table des Matières
loading

Table des Matières