ASSEMBLY
NOTE:
3 people are required for this step.
Step 4
4.1 Install the long ogees (C and C1) between two
columns (A). Use the screws (T) on the outside of
the long ogees (C and C1) and the screws (U) on the
inside of the long ogees (C and C1). Finish the
installation of the long ogees (C and C1) using the
screws (V) from the inside of each column (A)
as illustrated.
4.2 Install the short ogees (B and B1) between 2
columns (A). Use the screws (T) on the outside
of the ogee and screws (U) on the inside of the
short ogees (B and B1). Finish the installation of the
short ogees (B and B1) using the screws (V) from
the inside of each column (A) as illustrated.
Repeat for the remaining ogees.
Parts required for this step / Pièces requises pour cette étape :
12
T
8
ASSEMBLAGE
NOTE :
Pour cette étape, trois personnes sont requises.
Étape 4
4.1 Installer les moulures longues (C et C1) entre deux
colonnes (A) en utilisant les vis (T) à l'avant des
moulures et les vis (U) à l'arrière des moulures.
Terminer l'installation des moulures longues (C et C1)
en utilisant une vis (V) à l'intérieur de chaque
colonne (A), tel qu'illustré.
4.2 Installer les moulures courtes (B et B1) entre deux
colonnes (A) en utilisant les vis (T) à l'avant des
moulures ainsi que les vis (U) à l'arrière des moulures.
Terminer l'installation des moulures courtes (B et B1)
en utilisant une vis (V) à l'intérieur de chaque
colonne (A), tel qu'illustré.
Répéter pour les moulures restantes.
U
16
© Sojag inc. 2015
V
8