2.3 Install the UPS
For safety consideration, the E3 Performance is shipped without connecting battery wires.
Before installing the UPS, please follow the steps below to re-connect battery wires.
Step 1
Remove front panel.
Rack-mount installation
Step 1
Tower installation
Step 1
2.4 Setup the UPS
Step 1 - UPS input connection
Plug the UPS into a two-pole, three-wire, grounded receptacle only. Avoid using extension
cords.
INFOSEC UPS SYSTEM - 15, rue du Moulin - 44880 Sautron - FRANCE - www.infosec-ups.com
32
Hot Line – Tel + 33 (0)2 40 76 15 82 - Fax + 33 (0)240 94 29 51 - hotline@infosec.fr – 02 17 AA 59 204 40
Step 2
Connect the AC input and
re-connect battery wires.
Step 2
Step 3
Put the front panel back to the
unit.
Step 2
Step 3