Installation/maintenance:
Please firmly anchor the shower on a concrete base by means of the attached screws/dowels.
-
Please connect the water supply on the right-hand side of the shower (see drawing) via a garden
-
hose or fixed piping.
In the event of direct sun radiation and temperatures of approx. 25 degrees, the tank needs around 1
-
hour to heat up to a temperature of approx. 35 - 40 degrees. In the height of summer and under ideal
conditions, the water in the tank may heat up to 60 degrees.
Discharge:
The tank is discharged via a plug located at the rear bottom of the shower.
-
When discharging the shower head, the water supply to the shower head is to be blocked. Open all
-
valves and unscrew the hose.
General information – please note:
In winter, the shower is to be dismounted, discharged and stored in a frost-resistant place.
-
Maximum line pressure = 3-4 bar (in the event of greater pressure, a pressure regulator is to be
-
installed).
Due to its construction, the shower will continue to run for approx. 10-15 seconds with every closing
-
of the fittings.
Care:
We recommend regularly cleaning/polishing the shower with a soft cloth and stainless steel cleaner. If a light
rust film has occurred (which, unfortunately, cannot always be prevented even with stainless steel), please
remove it. Please do not use steel wool cleaning sponges or acidic cleaning agent. Clean the safety glass
front with a suitable glass cleaner.
6