Hardware Pack 4
Part
EE
Fig.18: Fix the left /right brackets (J1/J2) to the posts (A1/A2) with screws (AA), flat washers (BB).
Fig.19: Fix decorative railings (I1/I2) to middle top beam (E1) and left top beam / right top beam (E2/E3) with
bolts (AA), flat washers (BB).
Fig.20: Fix all brackets (L) to posts (A1/A2) with bolts (DD), flat washers (BB).
Fig.21: Hang the curtains (P) and mosquito nets (O) with the rings (EE).
Fig.22: Attach the mosquito nets and curtains to the posts (A1/A2) with hook-loops.
Fig.23: Anchor the gazebo to the wall through the brackets (L) and bolts (GG).
Fig.24: Raise the post base covers and insert ground spikes (KK) in the holes on post bases to anchor the assembled
gazebo to the ground. Lower the base overs when you are finished.
Your gazebo is completely assembled.
Description
Mosquito net
hook
Quantity
76
Image