Techne TE-10A Mode D'emploi page 21

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

8
A cooling coil will give control for temperatures between 5°C above ambient and 5°C above the
temperature of the water supply. See the list of accessories as the cooling coil is an accessory on the
TE-10A, TE-10D and the TU-20D.
The cooling coil is fitted to the thermoregulator just below the over-temperature cut-out reset
button. You will find a rubber moulding screwed to the base and filling two slots. Remove the screw
and moulding and use the screw to fit the cooling coil in the slots. Keep the moulding in a safe place
in case you need to replace it. Connect a hose from a tap to one end of the coil and from the other
end of the coil to drain. Adjust the water flow to give the required cooling.
9
For lower temperatures, a Dip Cooler such as a Techne RU-200 or RU-500 or a Flow Cooler such as
the FC-200 or FC-500 is required. Alternatively you could use either the RB-5A or the RB-12A Techne
refrigerated baths, which have integrated fridge coils and no additional cooling mechanism is
required.
See the individual instruction manuals for installation information.
10 If a thermometer is to be used it may be fitted in the end of the top cover using the O-ring, supplied
with the unit, between the two lugs. If a bridge is fitted it is necessary to remove the blanking plug.
Lugs
O Ring
Thermometer
Bridge
11 Fill the bath to between the minimum and maximum levels stated in the specification. If water is
used, demineralised water is preferred to reduce the formation of scale. If scale should form, use
only mild de-scaling agents to remove it. DO NOT attempt to hammer, chip or scrape the deposits
from the surface of the bath.
Slots for Cooling Coil
21
set

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Te-10dTu-20d

Table des Matières