IZAR CENTER
5.
Instructions
The device must be installed and used in firm
compliance with the specified rules in the present
technical description.
Any manipulation or installation, that is not properly carried
out and does not correspond to the mentioned regulations,
obviates any responsibility on the part of Diehl Metering. In
this case, the responsibility lies solely with the originator.
The IZAR CENTER should be mounted and put
into operation by qualified experts only.
6.
Installation / removal
Before every installation or removal the power
supply (socket 16, fig. I) must be interrupted.
Install IZAR CENTER
Snap the IZAR CENTER onto the hat rail. The black
safety catch (socket 65, fig. I) must point downwards
and engage audibly.
Remove IZAR CENTER
Use a pointed object (e.g. screwdriver) and pull the
black safety catch on the lower edge of the IZAR
CENTERs downwards.
The locking is released and you can remove the
IZAR CENTER from the hat rail.
- 12 -
Deutsch
English
Français