Installation Instructions; Venting Methods - Jenn-Air LI3ZVB Instructions D'installation Et Guide D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Determine which venting method is best for your application.
Vent system can terminate either through the wall or floor.
Island Location
Front (Standard)-Mounted
Blower Motor
A. Down vent
NOTE: For island locations, a front- or rear-mounted blower
motor can also be mounted for right or left venting if needed for
your application. Most island applications would still require the
venting to be directed down through the floor.
Built-In Cabinet Locations
A
B
A. Down vent
B. Left vent
C. Right vent
8

INSTALLATION INSTRUCTIONS

Venting Methods

Rear-Mounted Blower
Motor
A
Island Location - Vent System Installed Under a Concrete
Slab Using PVC Sewer Pipe
Front (Standard) Mounted Blower Motor
A
M
A
L
Rear Mounted Blower Motor
A
M
L
A. Wall cap
B. 6" (15.2 cm) round metal vent
C. 16" (40.6 cm) maximum
D. 6" (15.2 cm) round PVC sewer pipe
E. 6" (15.2 cm) round metal vent transition with damper
(supplied)
F. 6" (15.2 cm) round PVC coupling
G. Concrete slab
H. 6" (15.2 cm) round PVC sewer pipe
I. 6" (15.2 cm) round 90° PVC sewer pipe elbow
J. Tightly pack gravel or sand completely around pipe.
K. 6" (15.2 cm) round 90° PVC sewer pipe elbow
L. 6" (15.2 cm) round PVC coupling
M. 12" (30.5 cm) minimum
C
Calculating Vent System Length
3¼" x 10" (8.3 x 25.4 cm) rectangular vent is required from the
blower motor box. It can be transitioned to 6" (15.2 cm) round
vent if needed.
Maximum Length of Vent System
Vent
6" (15.2 cm) round
3¹⁄₄" x 10" (8.3 cm x 25.4 cm)
B
D
C
K
J
B
D
C
K
J
Length
35 ft (8.9 m)
35 ft (8.9 m)
E
F
G
H
I
E
F
G
H
I

Publicité

Table des Matières
loading

Produits Connexes pour Jenn-Air LI3ZVB

Ce manuel est également adapté pour:

W10342490d

Table des Matières