Commissioning; Maintenance; Releasing The Power Pack; Dimensional Drawing - Camille Bauer SIRAX B 811-6 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

12. Commissioning

The power supply unit must be capable of supplying
a brief current surge when switching on. The
transmitter presents a low impedance at the instant
of switching which requires a current I
... I
approx. 250 mA for the version with a power
Start
supply range 24 – 60 V DC/AC
... I
approx. 100 mA for the version with a power
Start
supply range 85 – 230 V DC/AC
The red LED may also light briefly (< 1 s). The green
LED must light immediately.
The signal for indicating a failure in the measurement/
supply circuit is only enabled after a delay of typically
2.5 s. The output contact remains in its reset state
during the switch-on delay!

13. Maintenance

No maintenance is required.

14. Releasing the power pack

1. Rotate the quick release screws 90°.
2. Withdraw the plug-in module.
1.
Fig. 15. Withdraw the module from the base.
32
of ...
Start
or
2.

15. Dimensional drawing

150.7
135.7
Fig. 16. Power pack SIRAX B 811.
+0
15
18
– 0.5

Publicité

Table des Matières
loading

Table des Matières