Télécharger Imprimer la page

RDI METAL WORKS Excalibur Instructions D'installation page 3

Masquer les pouces Voir aussi pour METAL WORKS Excalibur:

Publicité

Les langues disponibles

Les langues disponibles

LEVEL RAIL INSTRUCTIONS
3.
Test fit the rail panel. Once a proper fit is
ensured all cuts must be painted prior to
final installation (Fig. 8).
Set the panel in place. Pre-drill the screw
holes using a 5/32" metal drill bit. Secure
with the supplied panel attachment
hardware (Fig. 9) (2 screws per bracket).
Note: Rail ends may be painted with
any zinc rich primer or paint. For SATIN
BLACK touch-ups, we recommend
Rust-Oleum
*, Satin Canyon Black,
®
Color Code 249844. For BRONZE touch-
ups, we recommend Rust-Oleum
Hammered Brown, Color Code 210880.
*Rust-Oleum® is a registered trademark
of Rust-Oleum Brand Company.
4.
Place a bracket cover over the rail next
to the bracket and slide the bracket
cover toward the post until it snaps into
place (Fig. 10).
*,
®
(Fig. 8)
(Fig. 9)
5.
Assemble the 2 piece post trim cover by
inserting one fastener in each trim half
(Fig. 11). Snap these in place (Fig. 12)
concealing the post flange.
(Fig. 10)
3
(Fig. 11)
(Fig. 12)

Publicité

loading

Produits Connexes pour RDI METAL WORKS Excalibur