Safety Instructions - Penguin 91008 Manuel D'installation

Gazebo
Table des Matières

Publicité

Safety Instructions

1. Do not attempt to assemble the screenhouse under windy
conditions.
2. In the event of strong winds or storms are forecasted,
disassemble and store in a safe place. Minimum precaution
requires removal of the roof.
3. While this screenhouse meets CPAI Code 84 requirements for
flame retardency, keep open flames and inflammable materials
outside and at a safe distance from your screenhouse.
1. Prior to assembly:
Retain the packing carton for off-season storage.
A. To safely and easily assemble the screenhouse, a minimum of
two people are needed. You will need medium-sized slot head
and square screwdrivers and a sturdy chair or 5-6 foot stepladder.
B. You should erect your Abris Penguin screen room on as level
a spot as possible.
C. Remove the vinyl roof, roof tubes, vinyl hinges and the door
hardware box and inventory parts as follows.
DOOR
D. Completely open vinyl roof and lay on a flat surface,
preferably in direct sunlight to allow folds and creases to
disappear.
E. Set packing carton upright and remove wall assembly.
F. Unfold wall assembly like an accordion.
L:\WP51\Instructions\GAZEBO INSTRUCTION BOOKS\ABRIS\91008 91109.doc
2. To assemble the wall:
A. Form a rough circle with screening on the outside
like diagram.
B. Position opening
where you desire door.
With a header plate at the
top.
C. Line up the edge of the
doorframe and another frame so the frames are almost
touching.
D. Holding one end of
the vinyl hinge vertically
above two frames slowly
insert simultaneously into
both frames until
completely inserted.
3. Installation of metal tube
tips:
A. Take brackets and
screw to frame as
illustrated.
4. Assembly of roof to frame:
You will need two people and a stool or ladder.
A. One person should be on the stool or stepladder in
the center of the screen room holding hubs angled
downward, parallel with top of the wall panel. See
illustration below.
B. The second person starts to take the tubes in order as
per the appropriate diagram, place them on the hub and
tube tip.
C. Place the tube tip through the tube tip bracket as top
illustration shows.
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

91109912109131191412

Table des Matières